Galilean Baptist Church : Fact Sheet
|
| Purchase Opportunity |
|
Complete Parcel of 7.3 (net) acres is available
for purchase. |
| |
|
|
| Physical Description |
|
Church (sanctuary was destroyed, the fellowship hall
and classrooms remain) One Parsonages (1,100 sq. ft.) Vacant land
of approx. 3.73 acres |
| |
| Church Description |
|
|
|
Year Built
|
|
Phase 1 1957 (currently used as the fellowship hall
and classrooms)
Phase 2 1967 (sanctuary with minor addition)
Phase 3 1972 (pole barn with fenced parking lot) |
|
Size
|
|
The current building has a usable space of approximately
11,000 square feet |
| |
|
|
Gross Land Area
Land to Building |
|
Approximately 3.533 acres (current church and parking
lot with pole barn)
7.32 |
| Sanctuary Description |
|
Destroyed by fire in February of 2004. |
| Fellowship Hall Description |
|
Kitchen Area
|
|
2 Stoves, 2 Refrigerators, 2 Freezers (combined with
refrigerator) |
|
Fellowship Hall Size
|
|
72' by 36' for main open area |
|
Bathrooms
|
|
1 unisex |
|
Classrooms
|
|
6 smaller classrooms |
|
Roofing Material
|
|
The roof consists of a polyvinyl coating on a flat roof.
The roof is 7 years old with an expected life span of 20 years and
is currently under warranty (7 years remaining). |
| School Wing Description |
|
Classrooms
|
|
3 (including the kindergarten) |
|
Offices
|
|
2 |
|
Secretarial
|
|
1
1 Nursery (separate infant and toddler for church services)
|
|
Bathrooms
|
|
1 unisex
1 unisex in the kindergarten |
| Building's Mechanical Systems |
|
Heating
|
|
The building's main heating system is boiler, steam
heat with a baseboard system for distributing the hot water throughout
the building. The warm air is recirculated through the plenum by fans
with reheating coils in the plenum. |
|
Airconditioning
|
|
The building has roof top units for cooling. |
|
Electrical Service
|
|
The building uses Detroit Edison for power service.
The property does not have a transformer. |
| Pole Barn Description |
|
Size
|
|
1800 sq. ft (dimensions of 40' by 45') |
|
Year Built
|
|
1972 |
|
Height
|
|
Approximately 11 ft of clear span beneath the joists |
|
Building Materials
|
|
The building is comprised of aluminum sheet metal attached
to a steel infrastructure |
|
Roofing Material
|
|
Aluminum sheeting |
| Parking Lot Description |
|
Size
|
|
133 with 4 handicap Spaces |
|
Material
|
|
Asphalt of approx. 5 inches thick |
|
Maintenance
|
|
The parking lot is sealed approximately every 5 years
with the last application being 1996 |
|
Age
|
|
The current parking lot was put in place in 1967 |
|
Resurfacing
|
|
The parking lot received an additional layer of 1 inch
of asphalt in 1991 |
| Traffic Counts |
|
|
|
Seven Mile
|
|
25,057 cars per day (Middlebelt to Inkster both directions) |
|
Middlebelt
|
|
35,454 cars per day (Seven Mile to Eight Mile both
directions) |
| Disclaimer:
The information above is deemed to be accurate but Religious Real
Estate does not warranty or guarantee any of the information. The
buyer will be responsible for their own due diligence. |
|
|